Brass kitchen faucet and ivory stone counter beside a window overlooking a quiet Virginia garden in late fall.

Which Water System Is Your Next Round Hill Home On?

Loudoun Now once put it simply: Round Hill "is chiefly a utility provider." The numbers in that same story bear it out. In the town's fiscal year 2027 budget, $4.3 million is planned for water and sewer service and $697,000 for all other government operations.

For anyone comparing homes with a Round Hill address, that ratio matters more than it first appears. The Town's water and sewer system reaches well past its corporate limits, into many of the subdivisions buyers tour along Route 7. Two homes at similar prices, a few minutes apart, can be an in-town customer and an out-of-town customer of the same system, with different bills, and some neighborhoods on that system have pending projects of their own. In Round Hill, the utility map is a better guide to what you are buying than the town line.

The service map is much larger than the town

The Town's Utility Customer Handbook, updated January 2025, lists its water and sewer service area. It covers the corporate limits of the town, some portions of Hillwood Estates, and a long list of named neighborhoods: Villages of Round Hill, Mountain Valley, Fallswood, Greenwood Commons, Lake Point, Stoneleigh, Lake Ridge, Walraven along Michelle Way, West Shore Villages, The Bluffs, Brentwood Springs and Poplar Hill.

Many buyers assume a house in Lake Point or Villages of Round Hill has nothing to do with Town Hall because it sits outside the historic Main Street grid. The handbook says otherwise. Those households are Town utility customers, and the Town's budget decisions show up on their monthly bills. For a property beyond that listed service area, the questions about water and sewer are different ones, and they belong to that specific parcel.

What the in-town and out-of-town line costs today

The Town's adopted FY2027 fee schedule runs from July 1, 2026 to June 30, 2027. It lists in-town and out-of-town charges side by side.

FY2027 charge, July 1, 2026 to June 30, 2027 In town Out of town
Water, monthly minimum bill up to 1,000 gallons $13.14 $19.71
Water, cost per gallon $0.01314 $0.01971
Sewer, monthly minimum bill up to 1,000 gallons $13.80 $20.70
Sewer, cost per gallon $0.0138 $0.0207
One-time new account deposit, water and sewer $93 and $142 $163 and $237

Each out-of-town usage charge in that table, the minimum bills and the per-gallon rates for both water and sewer, is 1.5 times its in-town counterpart.

The FY2027 schedule raised water charges 10.9% and left sewer charges unchanged. According to Loudoun Now, the Town expected that to work out to an average 5% increase in monthly bills. It was the second year of 5% increases, following two years of 15% annual hikes under a rate study adopted in 2023. For a buyer, that history is useful context. The monthly utility line on a Round Hill home has moved noticeably in recent years, and out-of-town customers have seen those increases at the higher rate.

The same FY2027 schedule lists the town's residential real estate tax rate at $0.066 per $100 of county assessed value, a figure Loudoun Now called a Loudoun low. For lot buyers, the schedule's water and sewer availability fees for a 3/4-inch meter are $19,783 and $29,675.

These are published figures for one fiscal year. Treat them as general information, not legal, tax or financial advice, and confirm what applies to a specific property with the Town and the right professional before you rely on them.

Two neighborhoods with their own project lists

Within that service map, two outside-town neighborhoods have specific projects attached to them. Buyers touring there will want to know about them.

Stoneleigh is a 140-home subdivision outside the town limits. As Loudoun Now reported during the FY2027 budget talks, it runs on a water system that is not interconnected with the Town's main network. Built in the early 1990s, that system has had frequent water line breaks because of high water pressure and aging distribution lines. The Town has been developing a plan to create new pressure zones, a project estimated at $4.2 million, and a larger replacement of the lines may also be needed. In that same discussion, council members raised the idea of a special tax district or higher rates for Stoneleigh customers to move the work along faster.

Lake Point is a 300-home community served by a single water line that enters from under Route 7. Loudoun Now reported that the council has been planning a second connection across Sleeter Lake so the whole neighborhood would not depend on one line. At the time of that report, the project's cost had more than doubled to over $1 million, and construction the following year looked unlikely. The Town's FY2027 to FY2029 strategic action plan, a draft dated January 15, 2026, lists the second Lake Point connection under Sleeter Lake as a utility priority.

Neither item is a reason to rule out a house. Both are reasons to ask the seller and the Town specific questions before you write an offer, and to fold the answers into how you compare that home with one on another part of the map.

What the Town is spending on next

The two neighborhood projects sit inside a larger plan. Loudoun Now reported more than $15 million in planned utility upgrades, centered on replacing an undersized water treatment plant and upgrading treatment at other well sites.

That replacement plant is the Evening Star treatment plant. Loudoun Now reported that on June 3, 2026, the council endorsed contracting with Bowman Consulting to design and permit it, with the plant targeted to be operational by 2029. At its July 15 meeting, the council approved a $342,500 design-and-permitting contract for the plant, as Loudoun Now reported. The Town's June 1, 2026 rate study request for proposals says the 500,000-gallon Airmont water tank went into service in January 2026. The action plan also describes a new 12-inch main replacing an aging 6-inch main in the southern zone.

How that spending reaches customers' bills is the job of a new study. At that same July 15, 2026 meeting, the same Loudoun Now report says, the council awarded Stantec Consulting Services a $75,000 water and sewer rate study contract. Loudoun Now had earlier noted that this would be the first time in more than two decades the Town brought in a consultant for that work, since Mayor Scott Ramsey has led the cost and rate projections in-house since 2006. The Town's request for proposals calls for a separate cost-of-service analysis for Stoneleigh and schedules the final report presentation for January 2027.

Anyone closing on a Round Hill home this winter will likely own it when that report is presented. The FY2027 rates in the table above run through June 30, 2027. What comes after that is the study's subject.

Why this fall gives buyers room to ask

The market right now leaves time for these questions. For the three months ending October 2026, Home Market View, which compiles Redfin data, reports a median sale price of $759,511 in ZIP 20141, 7.3% lower than the same period a year earlier. Over that same window it counts 24 sales, a median of 41 days on market, and 59 active listings, 11.3% more than a year before. Of those 24 sales, 21 were single-family homes at a median of $772,170, and three were townhouses at a median of $465,018, too small a group to read much into. The same source puts the Round Hill city median at $904,371 and nearby Purcellville at $699,513 for the three months ending October 2026.

Across Western Loudoun more broadly, local brokerage figures published October 21, 2026 show that 73% of the 37 closings in the preceding 30 days sold below asking, with a median of 25 days on market.

So listings are up, prices are down from last year, and most recent regional sales closed under asking. A buyer weighing a Lake Point colonial against a house inside the town limits has the time to get a recent utility bill from each seller, ask the Town which customer category applies, and factor the answer into the offer. In a faster market, those questions tend to get skipped.

One practical note for touring this month: Loudoun County says the Route 7/690 project includes demolishing and rebuilding the Route 690 bridge over Route 7. Overnight traffic stoppages of up to 20 minutes begin the week of November 16, and drivers are advised to use alternate routes through December 18. Details are on the County's project update.

A few quick answers

Which Round Hill neighborhoods does the Town's system reach? The Town's Utility Customer Handbook names them: the corporate limits, portions of Hillwood Estates, and the neighborhoods listed above, from Villages of Round Hill to Poplar Hill. For any one house, the seller's recent utility bill is the quickest place to start.

When could rates change next? The FY2027 schedule runs through June 30, 2027, and the Stantec rate study's final report is scheduled for presentation in January 2027.

Where can I compare Round Hill with nearby towns? Our Round Hill neighborhood page is a good starting point, and our guides to Bluemont and Lovettsville cover two nearby alternatives.

If you're weighing a house in Lake Point, Stoneleigh, Villages of Round Hill or inside the town limits, I would be glad to help you collect the utility history and project details for each one, so your comparison rests on the whole cost of the home and not only the list price. Let's Connect with Meadow Leigh Smith.

Let's Make Your Next Move Meaningful

From preparing a property for market to finding the right place to call home, Meadow provides the strategy, care, and personal attention to make every step feel intentional.

Follow Me on Instagram